Progress Tracking Against Baseline.

Measure physical progress against the plan in real time, so a slipping package shows up while you can still recover it.

Bid comparison matrix and progress overview dashboard
  • "Hundreds of work orders, dozens of contractors, one clear view. ProcureX keeps our landmark project moving on schedule without the daily firefighting."
    Narsi Reddy

    Narsi Reddy

    Director, Trump Tower

  • High-rise construction with tower crane
    • 0 wks

      Earlier Slippage Detection

    • 0%

      Fewer Delayed Decisions

What Makes Procurex Work

Package progress with planned vs actual %

See Real Progress, Not Guesswork.

Capture physical % complete against the baseline on every package.

At-risk packages behind plan

Spot Slippage Early.

Actual-vs-plan variance surfaces before it reaches the critical path.

Progress tied to the 4Ms — men, machinery, material, money

Tie Progress To The 4Ms.

Link progress to the men, machinery, and material availability on site.

Everything This Covers

Actual-vs-baseline variance
Critical-path slippage alerts
4Ms-linked progress
Daily progress reports (DPR)
Progress feed to RA billing

Built to move the outcome, not just the data.

  • Capture Physical Progress, Not Opinions.

    Site-reported % complete against the baseline on every package and activity — what's actually built, not what's hoped.

    Site team reviewing physical progress on plans
  • Catch Slippage Before The Critical Path.

    Plan-vs-actual variance flags delay early, while there's still float to recover it.

    Variance flagging slippage early
  • Tie Progress To The 4Ms.

    Connect each update to the manpower, machinery and material actually deployed on site that week.

    Progress connected to the 4Ms on site
INTELLISUITE COPILOT

One AI layer, Present Of This Page.

The copilot drafts the look-ahead from the baseline and flags tasks that are slipping out of sequence.

WHY PROCUREX

Construction Planning That Just Holds.

ProcureX is where the baseline stops being a chart nobody runs - and becomes the plan your whole site works from, end to end.

  • One connected plan

    Baseline and weekly look-aheads are a single plan - not separate files.

  • Run against the baseline

    Re-plan freely - the baseline is kept for variance and defensible EOT claims.

  • AI handles the busywork

    IntelliSuite drafts the look-ahead and flags tasks slipping out of sequence.

  • Fits your stack

    Imports Primavera P6, MS Project and Excel - no rip-and-replace.

  • Built for Global sites

    RA billing, the 4Ms and ₹ lakh / crore reporting, out of the box.

  • One source, every role

    Directors, planners, finance and execs all work from one programme.

Have questions? Find answers

Any more question?Contact us
  • Physical % complete is captured against the baseline on every package — from the field, tied to the work actually done, not a number estimated on a review call.

  • Actual-vs-plan variance surfaces as soon as it appears — so a slipping package is flagged before it reaches the critical path, while you can still recover it.

  • Yes — progress is tied to the men, machinery and material actually on site, so you can see not just what's behind but why it's behind.

  • Yes — what's physically built flows into RA / progress billing and your finance system, so the bill and the site finally agree on one number.

Explore More

  • Construction planning

    Plan site work clearly.

    Explore
  • Cost control & EVM

    Control cost and variance.

    Explore
  • Work orders & RA billing

    Manage work and billing.

    Explore
  • Project controls center

    See project health fast.

    Explore